All Projects 300-Unit Multi-Family Development · Panama City, Florida

The Kelly
at 23rd

Full civil and site development for a 300-unit, eight-building market-rate apartment community just off East 23rd Street in Panama City, Florida.

  • 300 Units
  • 8 Buildings
  • 352,483 SF
  • Site Contractor
Project Overview

About the Project

The Kelly at 23rd is a large market-rate multi-family community located just off East 23rd Street in Panama City. The development consists of 300 apartment units across eight garden-style buildings totaling approximately 352,483 square feet. The residential buildings are three and four stories and offer one-, two-, and three-bedroom floor plans.

GCUC served as the site contractor responsible for the civil infrastructure and site-development work supporting the community. Our scope focused on preparing the property for vertical construction and delivering the underground utilities, access, parking, drainage, concrete, and finished site improvements required for the completed development. The apartment buildings and other vertical structures were constructed by others.

The completed community includes a large clubhouse, fitness center, swimming pool, grilling and recreation areas, pickleball court, dog park, bike storage, and walking paths. Together with the eight residential buildings and the parking and circulation network, these features required coordinated site infrastructure across a substantial development footprint.

300Apartment Homes
8Buildings
352,483Square Feet
3 & 4Story Buildings
From Raw Ground to Build-Ready

Built From the Ground Up

Every building at The Kelly at 23rd sits on pads GCUC prepared, over utilities GCUC installed, and along roads and parking GCUC paved.

What GCUC Delivered

Scope of Work

01

Site Preparation

  • Site preparation, earthwork, grading, and building-pad preparation
  • Final grading, restoration, and supporting site-development improvements
02

Underground Utilities

  • Water-main and site water infrastructure
  • Sanitary sewer infrastructure
  • Stormwater collection, conveyance, and drainage improvements
03

Paving and Concrete

  • Roadway, drive-aisle, and parking-area construction with asphalt paving
  • Concrete sidewalks and associated site concrete
Beginning to End

Project Gallery

Ground-level and aerial views of the site, from the first day of clearing through the finished community.

Site Development · Underground Utilities