Nellie Drive Extension
Phase 1 roadway, drainage, and regional stormwater infrastructure connecting Chat Holley Road to U.S. Highway 98 for Walton County.
- Roadway Extension
- Civil Contractor
- Under Construction
- Walton County
About the Project
The Nellie Drive Extension is Phase 1 of Walton County’s Old Town of Santa Rosa Regional Stormwater Management Facility and future park and event venue development. The project extends Nellie Drive from Chat Holley Road to U.S. Highway 98 at the existing signal east of Publix, creating a new north-south connection while establishing access to the county’s approximately 220-acre property. Phase 1 also includes the first two regional stormwater management ponds planned for the site.
GCUC is constructing the civil and roadway improvements for this first phase, including substantial clearing, earthwork, roadway construction, drainage and stormwater infrastructure, paving, curb and gutter, and erosion control measures. The work addresses longstanding drainage and water quality concerns in an area with a high groundwater table, wetlands, and limited historic stormwater infrastructure, while setting up the county’s larger plans for regional stormwater management, passive recreation, and a future event venue.
Clearing the Path Between
Chat Holley and U.S. 98
Roadway earthwork and drainage infrastructure taking shape across the corridor.
Scope of Work
Roadway and Earthwork
- Extension of Nellie Drive between Chat Holley Road and U.S. Highway 98
- Approximately 14.6 acres of clearing and grubbing
- Approximately 44,500 CY of excavation and 26,900 CY of embankment
- Roadway stabilization and aggregate base construction
Stormwater and Drainage
- Regional stormwater improvements, including the first two stormwater management ponds
- Sediment barriers, turbidity controls, and inlet protection
- Erosion control and final grading measures
Paving and Concrete
- Approximately 3,400 tons of asphalt and friction course paving
- Approximately 10,500 linear feet of Type F concrete curb and gutter
Project Gallery
From early roadway clearing in July to work along the corridor in August.
Stay tuned, we’ll be adding more photos and drone footage as the job moves forward.